Page Mill Road Intersection Improvements at El Camino Real

last updated: 10/13/2022 - 11:50

Project Limits: 
Page Mill Road at El Camino Real and west of Hanover Street in the City of Palo Alto

Project Description:
Intersection improvements to improve intersection efficiency and reduce queuing impacts. Provide bicycle and pedestrian safety improvements.

Project description: 
•    Restriping, installation of dedicated right turn lanes and bicycle slots on Page Mill Road
•    Modifying existing traffic signals and equipment, including removal of median poles
•    Relocating utilities
•    Shifting one median
•    Removing free right turns from Page Mill Road to El Camino Real by constructing bulb-outs
•    Closing the left turn median west of Hanover Street (HP campus entrance)

Project Timeline:
Construction to begin in early Fall of 2022 and completed by late 2023

Funding Source(s): 
•    2016 Measure B Expressway Program 
•    City of Palo Alto

Project Location: 

PageMillRd at El Camino Real location

Project Document Library:
95% Project Plan Set – Page Mill Road Intersection Improvements at El Camino Real

Project Point of Contact Regarding This Project
Email to: [email protected]                                   

©2023 County of Santa Clara. All rights reserved.