Latest project information
Project location
The bridge is located approximately 1 mile south of Bertram Rd on Alamitos Road.
Project description
The replacement bridge will be constructed adjacent to, on the upstream side of, the existing bridge. The new bridge will consist of a 3-span structure with 2-lanes of traffic, 4-foot shoulders, one sidewalk, and railings.
Schedule of construction
Tentatively scheduled for construction in 2021 and 2022.