Lawrence Expressway Pavement Rehabilitation Between US-101 and SR-237
last update: 06/09/2022 - 16:08
Project limit:
Between US-101 and SR-237
Project Description:
The project will rehabilitate Lawrence Expressway between US-101 (Bayshore Freeway) and SR-237 (Southbay Freeway). Work will include: asphalt overlay (hot-mix asphalt); pavement repairs (cold-in-place recycling); repair of sidewalk and curb & gutter; upgrade of existing pedestrian curb ramps to comply with current Americans with Disability Act (ADA) standards; adjustment of existing utilities to new road grades; installation of new detector loops for vehicles and bicycles; restriping, installation of new roadside signs; and installation of new concrete barrier and crash cushions at the Lakedale pedestrian overcrossing.
Project Status - Project Completed:
- Project advertisement: August 17, 2021.
-
Bid opening: September 9, 2021.
-
Bid award: October 4, 2021.
-
Construction schedule: Mid-March through June 2022.
Funding Source(s):
- 2016 Measure B Local Streets Program
- County Road Fund
Current Status:
Shoulder and median work is continuing. Expect delays in both directions between 9AM and 3PM.
Night work is scheduled to begin 5/23 and run through the end of June. Expect delays, including closures of the on- and off-ramps, between 9PM and 5AM.
Project Location:
Project Document Library:
Night work Notification
Lawrence Expy. Pavement Plans
Project Updates:
- Update:
- Link:
Point of Contact Regarding This Project:
Email to: [email protected]