Alamitos Creek Bridge Replacement

(Bridge # 37C0159, New Bridge #37C0603)

Project Work Description:   

The structure work to be done generally consists of constructing one bridge and four retaining walls; protecting in place a low-flow weir;  and removing a roadway bridge, a pedestrian bridge, and a stream gauging station.  

Project Work Schedule

Project construction work is scheduled for April through December 2015.  