Alamitos Creek Bridge Replacement
(Bridge # 37C0159, New Bridge #37C0603)
Project Work Description:
The structure work to be done generally consists of constructing one bridge and four retaining walls; protecting in place a low-flow weir; and removing a roadway bridge, a pedestrian bridge, and a stream gauging station.
Project Work Schedule:
Project construction work is scheduled for April through December 2015.
Project Map and Documents
-
LHS: Location Hydraulic Study
Questions and Answers