Alamitos Creek Bridge # 37C0159 Replacement

last updated:06/01/2022 - 10:08

(Current Bridge # 37C0159, New Bridge # 37C0603)

Latest Project Information: 

  • Alamitos Creek Bridge will be closed from 6/6/2022 to 6/10/2022, 24-hours full day closure from Monday through Friday. The bridge will be closed to all traffic, including bicyclists. A detour will be available via Hicks Road. The access to the bridge will be restored on 6/11/2022. County’s Contractor will install new bridge girders while the bridge is closed.

  • Unusual traffic delay is expected on early morning (between 7:30 AM and 8:30 AM) and late afternoon (between 4:30 PM and 5:30 PM) up to 30 minutes at a time through Monday to Saturday in the vicinity of the bridge location. 
  • Alamitos Creek Bridge Temporary Traffic Control Plan Notification 
  • Community Meeting (April 5th, 2021) Slides 


Project Location: The bridge is located approximately 1 miles south of Bertram Rd on Alamitos Road.

Project Description: The replacement bridge will be constructed adjacent to, on the upstream side of, the existing bridge. The new bridge will consist of a 3-span structure with 2-lanes of traffic, 4-foot shoulders, one sidewalk, and railings. 

Schedule of Construction: Tentatively scheduled for construction in 2021 and 2022.

Get Involved

Sign up for Project Updates

 

 

 

 

 

Why Replace and Relocate the Bridge

Project Map and Documents

Questions and Answers

Contact Us

Alamitos Creek Bridge
Alamitos Creek Bridge Roadway
Alamitos Creek Bridge Area Map

©2022 County of Santa Clara. All rights reserved.